HOME
Mayor's Message
eNews Signup
Economic Development
Employment
Pay Ticket Online
Pay Utility Bill
Sign Up for Emergency Alerts
Parks & Recreation
Community
Our Community
Emergency Alert Registration
City Charter
City Ordinances
Adopted Legislation
Economic Development
Planning & Zoning
Building Codes and Permits
Health Department (Lorain County Public Health)
Calendar of Events
City Map
Election/Voter Information
eNewsletter and Community Connection
General Information for Residents
Resource Directory
Report Street Light Outage
Farm Market Produce Stands
Permits, Licensing and Additional Services
North Ridgeville Magazine
Tobacco-Free Workplace Environment
Links and Resources
Departments
Administrative
Building
Cemeteries
Economic Development
Engineering
Finance
Fire
French Creek Wastewater Treatment Plant
Law Department and Mayors Court
Parks and Recreation
Police
Public Utilities
Senior Center
Service (Streets)
Council Boards
City Council
Board of Drainage and Flood Control
Board of Zoning and Building Appeals (BZA)
Civil Service Commission
Fair Housing Board
Parks and Recreation Commission
Planning Commission
Records Commission
FAQ
Contact Us
CITY OF NORTH RIDGEVILLE
Engineering
Sub-Menu
Engineering
Standard Construction Drawings
Drawing
Number
Access in PDF Format
DESCRIPTION INDEX
Effective
Date
Notes
GENERAL NOTES SHEET (1)
6/5/2020
GENERAL NOTES SHEET (2)
7/22/2014
GENERAL NOTES SHEET (SWP3)
11/22/2016
Pavements
PAV-1
PAVEMENT AND R/W STANDARDS
9/29/2009
PAV-2
MONUMENT BOX ASSEMBLES
10/1/2008
PAV-3
CURB AND GUTTER
10/1/2008
PAV-4
CONCRETE PAVEMENT STANDARDS
7/13/2010
PAV-5
FLEXIBLE PAVEMENT REPAIR DETAIL
10/1/2008
PAV-6
RIGID PAVEMENT REPAIR DETAIL
10/1/2008
PAV-7
RIGID PAVEMENT-JOINT REPAIR DETAILS
10/1/2008
PAV-8
CUL-DE-SAC PAVEMENT DETAILS
10/1/2008
PAV-9
CURB RAMP
10/1/2008
Sanitary Sewers
SAN-1
PRECAST CONCRETE MANHOLE
12/7/2009
SAN-2
PRECAST CONCRETE DROP MANHOLE
10/1/2008
SAN-3
LANDING PLATFORM
10/1/2008
SAN-4
ALTERNATIVE LANDING PLATFORM
10/1/2008
SAN-5
SANITARY SERVICE CONNECTION DETAILS
10/1/2008
SAN-6
DOUBLE LOT SERVICE CONNECTION
10/1/2008
SAN-7
STANDARD RISER DETAIL
10/1/2008
SAN-8
SANITARY SERVICE CONNECTION
8/12/2009
SAN-9
CLEANOUT DETAIL
8/12/2009
SAN-10
SANITARY SERVICE DETAILS
10/1/2008
SAN-11
CONCRETE ENCASEMENT TRENCH X-ING DETAIL
10/1/2008
SAN-12
PIPE TAPPING DETAIL
10/1/2008
SAN-13
NOT USED
10/1/2008
Waterlines
WAT-1
GENERAL HYDRANT
3/9/2009
WAT-2
HYDRANT TYPE A
3/9/2009
WAT-3
HYDRANT TYPE B
10/1/2008
WAT-4
HYDRANT TYPE C
10/1/2008
WAT-5
2-1/2" HOSE NOZZLE HYDRANT CONNECTION
10/1/2008
WAT-6
4" PUMPER NOZZLE HYDRANT CONNECTION
10/1/2008
WAT-7
THRUST BLOCK DETAIL
10/1/2008
WAT-8
CUT-IN TEE DETAIL
10/1/2008
WAT-9
WATER MAIN LOWERING
10/1/2008
WAT-10
TYPICAL FLUSHING ASSEMBLY
10/1/2008
WAT-11
STANDARD CUL-DE-SAC HYDRANT/LOOP SCHEMATIC
10/1/2008
WAT-12
SHUTOFF VALVE LOCATION AT "T" INTERSECTIONS
10/1/2008
WAT-13
1" SERVICE CONNECTION
3/9/2009
WAT-14
GAS-FIRED HOT WATER HEATER PIPING DIAGRAM
3/9/2009
WAT-15
WATER SERVICE ENTRANCE DETAIL
10/1/2008
WAT-16
SPRINKLER RISER DETAIL
10/1/2008
WAT-17
WATER METER VAULT FOR 1 INCH SERVICE
5/23/2017
Miscellaneous
MIS-1
TRENCH DETAIL
8/20/2014
MIS-2
BORING DETAIL
10/1/2008
Storm Sewers
STM-1
PRECAST CONCRETE MANHOLE
12/7/2009
STM-2
CATCH BASIN MOUNTABLE CURB
10/1/2008
STM-3
CATCH BASIN W/O SUMP MOUNTABLE CURB
10/1/2008
STM-4
CATCH BASIN UPRIGHT CURB
10/1/2008
STM-5
CATCH BASIN WIO SUMP UPRIGHT CURB
10/1/2008
STM-6
CATCH BASIN 2-2B
10/1/2008
STM-7
CATCH BASIN 2-3 AND 2-4
10/1/2008
STM-8
ROADSIDE & YARD INLET DETAILS
10/1/2008
STM-10
STANDARD NO.1 HEADWALL
10/1/2008
STM-11
STANDARD N0.2 HEADWALL
10/1/2008
STM-12
STANDARD NO. 3 HEADWALL
10/1/2008
STM-13
HEADWALL ROCK CHANNEL PROTECTION
10/1/2008
Storm Water Pollution
SWP-1
INFILTRATION TRENCH
10/1/2008
SWP-2
GRASS FILTER STRIP
10/1/2008
SWP-3
GRASS SWALE
10/1/2008
SWP-4
LEVEL SPREADER VEGETATED
10/1/2008
SWP-5
LEVEL SPREADER RIGID LIP
10/1/2008
SWP-6
ROCK LINED CHANNEL
10/1/2008
SWP-7
ROCK OUTLET PROTECTION
10/1/2008
SWP-8
DIVERSION
10/1/2008
SWP-9
TEMPORARY DIVERSION
10/1/2008
SWP-10
ROCK CHECK DAM
10/1/2008
SWP-11
TEMPORARY ACCESS BRIDGE
10/1/2008
SWP-12
TEMPORARY STREAM FORD
10/1/2008
SWP-13
CULVERT STREAM CROSSING
10/1/2008
SWP-14
WATER BAR
10/1/2008
SWP-15
DEWATERING
10/1/2008
SWP-16
SEDIMENT BASINS
10/1/2008
SWP-17
SEDIMENT TRAPS
10/1/2008
SWP-18
SILT FENCE
10/1/2008
SWP-19
EXCAVATED DROP INLET SEDIMENT PROTECTION
10/1/2008
SWP-20
GEOTEXTILE-STONE INLET PROTECTION
10/1/2008
SWP-21
GEOTEXTILE-STONE INLET PROTECTION
10/1/2008
SWP-22
GEOTEXTILE-STONE INLET PROTECTION-CURB INLETS
10/1/2008
SWP-23
BLOCK AND GRAVEL DROP INLET PROTECTION
10/1/2008
SWP-24
FILTER BERM
10/1/2008
SWP-25
FILTER SOCK
10/1/2008
SWP-26
TREE NATURAL AREA PROTECTION
10/1/2008
SWP-27
CONSTRUCTION ENTRANCE
10/1/2008
SWP-28
NOT USED
10/1/2008
SWP-29
DUST CONTROL
10/1/2008
SWP-30
TEMPORARY ROLLED EROSION PRODUCT
10/1/2008
SWP-31
TURF REINFORCEMENT MATTING
10/1/2008
SWP-32
SMALL CONSTRUCTION SITE CONTROLS
10/1/2008
SWP-33
CONCRETE WASH OUT PIT
10/1/2008