Bagley Road Bridge Closure (revised 9-3-2024)
The Bagley Road bridge over the Ohio Turnpike will be closed for approximately six months beginning April 29, 2024 due to construction work by the Ohio Turnpike Commission. Major work involves raising the bridge elevation by 2.5 inches, replacing the bridge deck approach slabs and deck joints, and performing restoration of the substructure. Detour signs are posted. The reopening date is tentatively scheduled for Friday, October 25, 2024.
See the suggested detour route map below.
Attachments Available to Download:
|