PRINT ARTICLE

Print    Close This Window
Hydrant Replacement Project to Begin April 1 (Revised 3-22-2024)
The 2024 Hydrant Replacement Project was awarded to Diggers of Ohio, LLC for $385,256.81. The project includes the replacement of 35 existing fire hydrants along Chestnut Ridge Road, Lorain Road, Island Road, Pitts Boulevard, Wil-Lou Lane, Root Road and Reed Road. Work is expected to begin April 1 and last approximately two months. Water will be shut off temporarily during this work and impacted residents will be notified ahead of time. The location maps are shown below and the tentative schedule for each location.
Attachments Available To Download:
Tentative Schedule for each location
Location Map (35 fire hydrant locations)
Location Map (Pitts, Wil-Lou, Chestnut Ridge)
Location Map (Chestnut Ridge, Lorain, Island, Root, Reed)