Replacement of Mills Road Bridge Over French Creek, Spring 2020

The City of North Ridgeville obtained a grant through the Ohio Department of Transportation’s Municipal Bridge Program to provide federal funding for a major portion of the costs to replace the Mills Road bridge over French Creek.  The bridge is located on Mills Road midway between Westminister Avenue and Greenwich Avenue.  The replacement is necessary due to the serious condition of the bridge deck concrete slab, design loading deficiencies of the foundation, and inadequate waterway opening.

The bridge width will be widened from 27 feet to 40 feet and sidewalks will be added. 

The project is in the preliminary design stage, and construction is estimated to begin in Spring of 2020. 

One lane of traffic will be maintained during construction with the use of portable temporary signals.  Alternative detour routes will be 1) S.R. 83, Riegelsberger Road and Jaycox Road or 2) S.R. 83, Center Ridge Road and Jaycox Road.  Part-width bridge construction will be used to complete the bridge in two phases.  Temporary right of way will be acquired in order to provide space to construct temporary pavement to maintain traffic during construction.

The total cost of the design, construction and right of way acquisition is estimated to be $1,329,470.  Federal grant funds total $768,579.00.

If you have any questions, please contact the Engineering Department at (440) 353-0842. 